The Blenheim Water Pollution Control Plant was last upgraded in 1997. This is a project to upgrade the headworks system and chemical feed system to improve facility operations and Phosphorus reductions within the treatment system.

The New Chemical System and Headworks Building at Blenheim Water Pollution Control Plant Project has a total projected value of $450,000. The timeline for this project is September 2016 to March 2018.

 This is a graphical representation of the information above